Marquee Hire Quotes: Ground and Access Checks to Collect First
Short answer: A marquee quote based only on guest numbers is a guess, because the ground decides the price. Slope, surface, pegging or ballast, overhead lines, gate widths, vehicle access, distance from the van to the pitch, and power all change labour, kit and even whether the structure can go up. The common mistakes below are mostly omissions in the enquiry form. Fix them, and quotes arrive more accurate, site visits become targeted, and fewer jobs turn into arguments on the build day.
Mistake 1: Asking only for guests and date
A form with name, date and "number of guests" gives you a size, but not a job. Two weddings of eighty can be a flat lawn behind the house and a sloping paddock reached by a farm track.
Fix: Keep the first screen short, then ask site questions on a second screen. Explain why: "These help us quote the real job, not a rough one." People answer when they see a reason.
Mistake 2: Not asking what the surface is
Pegs go into grass and soil. They do not go into tarmac, paving or a roof terrace. Those need weights, which means more kit and a bigger crew.
Fix: Make surface a required choice: grass, gravel, tarmac or concrete, paving, deck, other. Allow more than one if the tent spans two. Add a note box and the option to upload a photo.
Mistake 3: Skipping slope and ground condition
A slight slope may be corrected with packing. A pronounced one may rule out a particular frame. Soft or waterlogged ground changes how a crew moves pallets.
Fix: Ask "Is the area flat?" with three honest answers: flat, slight slope, noticeable slope. Add "Is the ground ever soft or wet?" Do not rely on the customer's judgement alone. Treat the answers as a flag for your own survey.
Mistake 4: Ignoring underground and overhead hazards
Pegs can hit buried services such as pipes, cables or drainage. Overhead lines and low branches limit height and crane use. A customer often does not think about either.
Fix: Add a question about known buried services and an instruction to mark them on a photo or plan. Ask whether there are overhead cables or trees close to the pitch. Your own health and safety procedure sets what you must check on site. The form should only collect the first answers.
Mistake 5: Forgetting how the van reaches the pitch
Crews carry long poles and heavy sections by hand. A narrow side gate, steps or a long walk turns a two-hour build into six.
Fix: Ask for the narrowest gate width, steps on the route, the distance from where a vehicle can park to the pitch, and whether the vehicle can drive onto the grass. Give example answers beside each box, such as "side gate 90 cm". Customers often have measured it for something else, and a short example prompts them.
Mistake 6: Treating power and lighting as an afterthought
Lighting, heating, catering and music all need electricity. If the customer assumes they can plug in at the house, you may end up arranging a generator late.
Fix: Ask what will be used, such as lighting, band, food van, heaters, and whether a suitable outdoor supply is available. If not, offer generators as an optional add-on on the quote.
Mistake 7: Losing the plan in an email thread
Photos, sketches and notes arrive scattered over several messages.
Fix: Let the form accept up to five photos and one plan or sketch. Add a short instruction: "A photo standing at the house looking at the lawn, and one standing at the gate, help most." Store them against the enquiry so the surveyor and the quote writer both see them.
A suggested enquiry structure
- Event: date, setup day wanted, times, event type.
- Size: guests, seating style, dance floor, bar, catering space.
- Site: address, surface, slope, access measurements, parking.
- Power and lighting needs.
- Photos and notes.
- Contact details and how they prefer to hear from you.
Show a progress bar. Short steps feel lighter, and abandoned forms still hold partial data you can follow up if you capture contact details early and the visitor has agreed to it.
What the quote should come back with
A good quote lists the structure size and style, the flooring, lining, lighting and heating, delivery and collection, the crew and the days, and the assumptions it relies on. Put those assumptions in plain words, for example "Assumes a flat grassed pitch, vehicle access to within 20 metres and gate width not less than 1.2 metres." If the real site differs, the price changes, and everybody already knows.
Quote validity
Say how long a quote is valid, and that dates are held only after a deposit. Marquees are limited by stock, so a date can sell out while a quote sits unopened.
Survey versus photos
Decide when you need a visit. A rule of thumb you set yourself might be: surveys for anything over a certain size, anything on a slope, or anything near hazards. Offer smaller, simple jobs as photo-based quotes. The form can mark each enquiry with a flag, such as "survey suggested", based on the answers.
Showing products clearly
Each structure type deserves a page with sizes, capacities for seated dinner versus standing reception, and what is included. Use plain figures from your own manufacturer data. Product markup is described at schema.org/Product, though most hire companies benefit more from clear text and photographs than from markup.
FAQ
Can customers choose a marquee size online?
They can choose a range. Final size depends on layout, so label online choices "estimated" until you have checked the site and plan.
Do I need a site visit for every job?
Not necessarily. Use photos and answers to filter, and visit those that look complex.
How do I handle weather?
State your policy on wind and rain in the quote, and keep decisions with your crew leader on the day. Check any manufacturer guidance for wind limits on your structures.
Should the form show prices?
Showing a starting price for each size helps people self-select. Keep real quotes for the site-specific total.
If your quote requests keep returning with missing site details, we can rebuild the enquiry form so the right questions get asked up front.