Lorixen.
EN

A Pre-Launch Checklist for a New Business Website

Short answer: Go live with a written checklist, split into three stages: the day before, launch day, and the first forty-eight hours. Before launch, remove every noindex tag and staging block, confirm redirects from the old addresses, and back up the old site. On launch day, test every form, payment step, analytics tag and outgoing email from the live address. Afterwards, submit the sitemap, watch for server errors, and decide in advance the conditions under which you will roll back. A checklist turns a stressful switch into a series of small checks.

The day before

Most launch problems are settled before the switch. Work through these items with a second person if you can:

  1. Remove the staging blocks. Check the robots instructions. Staging sites often carry a noindex tag or a blocking rule. A new site that still has them will not appear in search.
  2. Check canonicals. Every canonical address should point to the live domain, not the staging address.
  3. Map the old addresses. List every old URL that had search traffic or links, and set a permanent redirect to the closest new page. Test a sample of at least twenty.
  4. Prepare the sitemap. Generate it, check it lists only the pages you want found, and confirm it loads.
  5. Confirm the certificate and the domain. Check that the certificate covers both the www and non-www versions if you use both.
  6. Lower the DNS time to live. Ask your DNS provider to reduce the record lifetime a day ahead, so that any change to the address spreads faster. Put the normal value back once the site is stable.
  7. Take a full backup of the old site. Keep it somewhere you can reach quickly.

Launch day

Switch the site at a time when you can watch it, ideally in the morning with the whole day ahead. Then work through the following:

  • Home page and key pages. Open each on a phone and a laptop. Check the layout, the images and the navigation.
  • Every form. Send a test submission from each one. Confirm the message arrives in the right inbox, and check the spam folder too.
  • Payments. Run a test order in the payment provider's test mode, then make a real low-value order if you accept payments, and refund it.
  • Analytics. Open the real-time view in GA4 and check that your own visit appears. Then click the main button and confirm the event is recorded.
  • Outgoing email. Send an order or booking confirmation to an external address. Check that it arrives and that the sender domain and authentication records match your plan.
  • Error page. Visit a page that does not exist and confirm your 404 page appears, with a link back to the homepage.
  • Redirects. Open five of the old addresses and check that each one lands on the right page.

The first forty-eight hours

Some problems only appear once real visitors arrive. In the first two days:

  1. Submit the sitemap in Search Console and Bing Webmaster Tools.
  2. Check the Page indexing report in Search Console for new errors, and fix any redirect chains.
  3. Watch the server logs or the hosting dashboard for a spike in 5xx errors.
  4. Read every form submission and look for messages that failed to reach you.
  5. Check the mobile layout on a range of devices, using the reports from the first day as your guide.

Decide the rollback rule in advance

A rollback is easier to carry out when the rule is written down before launch. An example:

  • If the enquiry form or the checkout fails and cannot be fixed within an hour, switch the domain back to the old site.
  • If the server returns errors for more than a small share of requests in the first hour, pause and investigate before going further.
  • The person who makes the call is named in advance, and everyone knows the reversal steps.

Set the thresholds to suit your business. A shop that takes many orders an hour will need a tighter rule than a brochure site.

Watching the first week

Check the inbox and the form log at the start and end of each working day for the first week. A form that works on the launch day can still fail after a plugin update or a change in the email provider. Keep a short note of every enquiry you received, and compare the count with the same week the previous year, if you have that data. A sudden drop is the signal that something in the chain has broken, even when every page looks fine.

What to keep after launch

Store the checklist with the site notes, and record what you found on launch day. Next time you update the site, the list will be shorter and more useful. Remove any item that never caught a problem, and add any issue that surprised you.

Who does what

Assign each check to a named person before launch day. The owner usually signs off content, prices and the decision to switch. The developer or technical lead handles the switch, the redirects and the certificate. A second tester, ideally someone who has never seen the site, works through the forms and the checkout as a customer would. Someone else watches the analytics and the inbox.

Write the names next to the checklist items. When everyone can see who owns each line, nothing depends on memory. A table with three columns, item, owner and status, is enough for most small projects.

If one person covers several roles, schedule the tester's pass for after a break. Fresh eyes catch errors the builder has stopped seeing.

FAQ

How long should the checklist take?

Expect a full day for a small site. Larger shops or sites with integrations need more time for the payment and email checks.

Should I launch on a Friday?

Avoid it if you can. Problems that appear on a Friday afternoon are harder to fix before the weekend, when your team may be unreachable.

What if I find a problem after launch?

Fix small things live, such as a typo or a broken link. Keep the rollback rule for anything that stops enquiries or sales.

Do I need to tell search engines about the new site?

Yes, submit the sitemap in Search Console. Google may take some time to crawl the new addresses, so the redirects you set up matter during that period.

If you would like us to run the checklist with you, including the redirect tests and the email check, send us the launch date.

Sources

WhatsAppBook a call